
Production indicators are steadily increasing at the Galaymor quarry enterprise located in the Tagtabazar district of Mary province, which belongs to the Ministry of Industry and Construction Production of Turkmenistan. In order to meet the demands of large-scale construction projects underway in the country, the enterprise's material and technical base is being modernized.
Since the beginning of this year, high-performance machinery from world-renowned companies of the People's Republic of China has arrived at the enterprise in stages. A large batch of SY415H excavators and SYZ320C-8Y trucks from "Sany Heavy Industry Co., Ltd.", as well as powerful XCMG ZL50GN loaders, has significantly increased the pace of production. This new equipment has been assigned to experienced specialists and is being used carefully and efficiently.
Work at the quarry continues 24/7 in three shifts. Currently, 7 crushing and screening plants operate here, engaged in the extraction and processing of underground resources. Non-metallic construction products such as various types and sizes of washed sand and crushed stone are produced from the main raw material, a sand-gravel mixture.
During the past three months, more than 97,036 cubic meters of non-metallic products were produced at the enterprise, exceeding the set plans. Finished products are regularly sent to various parts of the country via road and rail networks.
Currently, 141 specialists work at the enterprise. The introduction of the world's leading technologies and advanced equipment eases the work of specialists and ensures high product quality. The employees of the enterprise aim to further increase production rates through new creative efforts.
The increase in the capacity of the Galaymor quarry enterprise further strengthens the supply of local raw materials to Turkmenistan's construction sector.
Keywords